TM 5-6675-348-13&P
BLADE PRO MOTOR GRADER CONTROL SYSTEM VALVE CALIBRATION.
a.
130G Grader Setup.
(1)
Start 130G Grader (1) (TM 5-3805-261-10).
NOTE
To ease 130G Grader setup, park
grader on level surface.
(2)
Park 130G Grader (1) on solid material such as
concrete, asphalt, or compacted soil.
b. Blade Pro Motor Grader Control System Valve Calibration.
Valve calibration is required whenever you change hoses, lift cylinders, or any other
repairs to the hydraulic system. Failure to perform valve calibration could result in
improper equipment performance or damage to equipment.
Perform the sensor calibration procedures prior to performing the valve calibration
procedures. Failure to comply could result in improper 130G Grader performance.
Operate the machine until the hydraulic oil has reached normal operating temperature
before starting the valve calibration. Failure to comply could result in improper Blade
Pro Motor Grader Control System performance.
NOTE
Blade Pro Setup will be displayed across both windows for a few seconds, then
REFERENCE and 0.00 will be displayed.
Ensure 130G Grader is on level ground, A-frame is centered, and blade is perpendicular
to frame.
Valve calibration and sensor calibration settings are specific for the make, model,
bumper number, and serial number once calibration is completed.
(1)
Position OFF/ON/SET-UP switch (2) in
SET-UP position.
(2)
Operate left Increase/Decrease toggle
switch (3) down until CALIBRATION
appears in the left window (4). Press
left RESET button (5) to enter this
menu.