Blade Pro Motor Grader Control System Valve Calibration. - Continued
Blade Pro Motor Grader Control System Valve Calibration. - Continued

Laser Leveling Equipment (Lle) For Graders, Dozers, & Scrapers Page Navigation
  64    65    66    67    68  69  70    71    72    73    74  
img
TM 5-6675-348-13&P
NOTE
Start calibrating control valves by push-
ing left or right RESET Button or by
holding the Remote Offset Switch. This
switch is located on articulation control
lever.
If the following calibration cannot be
performed at any time, contact Trimble
Navigation.
This section of valve calibration is called
warm-up period and usually lasts
approximately 3 minutes. Numbers will
be displayed in the right window during
this section and they should range from
0.00% to 3.50%. If after 3 minutes a mes-
sage appears across both windows
indicating VALVE ERROR.
The next section displayed in the left
window after the warm-up section is
completed is MAXIMUM.
The correct number displayed in the
right window will be 3.00% 0.10%. If
this number is not achieved, the
system will not move to the next
cycle. Repeat Step (1).
After MAXIMUM cycle has reached
its proper calibration number, the
next section displayed in the left
window is MEDIUM.
The correct number for this cycle will
be 1.00% 0.01%. If this number is not
achieved, the system will not move to
the next cycle.
Next section that will be displayed in
the window after MEDIUM has
reached its calibration number is
MINIMUM. Correct calibration
number for this cycle will be 0.25%
0.01%. If this number is not
achieved, the system will not move to
next cycle.