TM 5-6675-348-13&P
This task covers:
a.
Clear Memory.
b.
System Setup.
c. Edit Data.
d.
Boom Angle Calibration.
e.
Arm Angle Calibration.
f.
Bucket Cylinder Calibration.
g.
Pitch Angle Calibration.
h.
Roll Angle Calibration.
i.
Follow-On Maintenance.
INITIAL SETUP
Models
Personnel Required
MOS 62B
Bucket-ProTM System
MOS 44B
Special Tools
Equipment Condition
ANSI
Engine running (TM 5-3805-280-10).
Tracks chocked (TM 5-3805-280-10).
Memory must be cleared before machine
is calibrated. Failure to comply could result
in incorrect calibration.
a.
Clear Memory.
(1)
Turn on Graphic Display.
Press Down (↓) button twice.
(2)
Point menu arrows to SETUP SYSTEM mode, using Down (↓)
(3)
button.
(4)
Press ENTER button.
To bypass the entry code, press and hold Up and Down (↑↓)
(5)
buttons at the same time, while pressing ENTER button.
(6)
(7)
Press ENTER button.
(8)
(9)
Press ENTER button.
(10) In the ARE YOU SURE? dialog box, select YES.
(11) Press ENTER button. Bucket-ProTM System memory is now clear.
(12) Turn off Graphic Display.
(13) To access SETUP MENU and re-enter data, repeat Steps (1)
through (5).