• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
General Wire Test Procedures. - Continued
Installation

Laser Leveling Equipment (Lle) For Graders, Dozers, & Scrapers Page Navigation
  19    20    21    22    23  24  25    26    27    28    29  
img
. . . . . . . . . . . . . .
TM 5-6675-348-13&P
GRADIO DISPLAY SYSTEM MAINTENANCE
SECTION V.
GRADIO DISPLAY SYSTEM INSTALLATION FOR DOZER.
2-15.
This Task Covers:
a. Installation.
b. Follow-On Maintenance.
INITIAL SETUP
Models
Materials and Parts
D7F Dozer (TM 5-2410-233-Series)
Cloth, Lint-Free, Item 3, Appendix F
D7G Dozer (TM 5-2410-237-Series)
Paint, Spray, Black, Item 8, Appendix F
D7H Dozer
Rags, Wiping, Item 9, Appendix F
D7R Dozer
Solder, Lead-Tin Alloy Item 10, Appendix F
Tags, Identification, Item 13, Appendix F
Tools and Special Tools
Ties, Cable, Item 15, Appendix F
Tool Kit, Automotive Maintenance, Common
Kit, Voltage Protection, Item 1, Appendix K
No. 2, Item 2, Appendix B
Label, Warning, Welding/Jump Starting;
Tool Kit, Electric, Item 3, Appendix B
Item 2, Appendix K
Tool Kit, Welders, Item 4, Appendix B
Mount, MM2E Manual Mast, Item 3,
Appendix K
Personnel Required
MOS 62B
MOS 44B
Equipment Condition
Engine OFF
(TM 5-2410-233-Series)
(TM 5-2410-237-Series).
Seat removed
(TM 5-2410-233-Series)
(TM 5-2410-237-Series).
Main Power Cable disconnected
(TM 5-3805-233-Series)
(TM 5-3805-237-Series).
2-19


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.