TM 5-6675-348-13&P
a.
Installation.
performed on a hard surface, such as
concrete or asphalt. Failure to
comply will cause the system to not
operate properly.
NOTE
the Dozer on level ground.
(1) Using a straightedge and level on top
edge of blade (1), level blade.
(2) Measure and mark center of
blade (1).
(3) Cut two 8-in. (20.3 cm) metal
plates (3) at a 45-degree angle.
Unsafe welding practices can cause
serious injury from fire, explosions, or
harmful agents. Allow only
authorized personnel to weld or cut
metals, and follow safety precautions
in TC 9-237. Protective clothing and
goggles must be worn, adequate
protective equipment must be used, a
suitable fire extinguisher must be
kept nearby, and requirements of
TC 9-237 must be strictly followed.
Failure to comply may result in
serious injury or death to personnel.
NOTE
This procedure is repeated on both sides
of Mast Mount. Left side is shown.
(4) Center and level Mast Mount (2) at
center of Blade (1) and weld.
(5) Weld two metal plates (3) to Mast
Mount (2) and Blade (1).
2-20