• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Installation - Continued
Installation - Continued

Laser Leveling Equipment (Lle) For Graders, Dozers, & Scrapers Page Navigation
  23    24    25    26    27  28  29    30    31    32    33  
img
TM 5-6675-348-13&P
Allow solder to cool before handling wire.
Failure to comply may result in injury to
personnel.
(21) Solder two connections (24) to Red Wire (25)
and Black Wire (26).
(22) Remove two nuts (27).
(23) Install Red Wire (25) on Positive (+) Battery
Terminal (28).
(24) Install Black Wire (26) on Negative (-) Battery
Terminal (29).
(25) Install and tighten nuts (27).
(26) Drill one 1/2-in. (13 mm) hole (30) in lower left
corner of Battery Box (23), approximately
1 in. (2.54 cm) from side and 4 in. (10 cm) from
bottom.
2-23


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.