• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
GRADIO DISPLAY SYSTEM INSTALLATION FOR SCRAPERS. - Continued
GRADIO DISPLAY SYSTEM INSTALLATION FOR SCRAPERS. - Continued

Laser Leveling Equipment (Lle) For Graders, Dozers, & Scrapers Page Navigation
  28    29    30    31    32  33  34    35    36    37    38  
img
TM 5-6675-348-13&P
(5) Use existing hole in Hood (6) for left side of
Display Mount hole (7). Right side hole
located 12 in. (30.5 cm) from right side of
Hood (6).
(6) Mark right side Display Mount (5) hole
on Hood (6).
(7) Center punch and drill 1/2-in. (13 mm)
hole (7) in Hood (6).
(8) Install Display Mount (5), Loop
Clamp (8), two bolts (9), Display Mount
Plate (10) to Hood (6).
(9) Leave approximately 12 in. (30.5 cm) of
Power Cable (11) past Loop Clamp (8).
(10) Tighten bolts (9).
(11) Attach Power Cable (11) to Connector
Holder (3).
2-28


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.