Installation - Continued
Installation - Continued

Laser Leveling Equipment (Lle) For Graders, Dozers, & Scrapers Page Navigation
  22    23    24    25    26  27  28    29    30    31    32  
img
TM 5-6675-348-13&P
NOTE
Steps (18) and (19) require the aid
of an assistant.
(18) Route Power Cable (17) through
Engine Compartment (18), under
floorboards (19), through front side of
Seat Compartment (20).
NOTE
Install cable ties as needed.
Leave excess Power Cable coiled
and Power Cable tied under seat.
(19) Route Power Cable (17) through left
side of Seat Compartment (21) and
along existing Battery Cables (22) into
Battery Box (23).
(20) Strip approximately 12 in. (30.5 cm) of
insulation from end of Power
Cable (17).
2-22