TM 5-6675-348-13&P
(47) Route Load Sense Line (37), Return Line (43), and Pressure Line (44) through Gooseneck (27).
(48) Remove two bolts (45) and flat washers (46) from LACV (42).
NOTE
Step (49) applies to left side of 130G Grader only.
Retain Loop Clamp for installation of Proportional Valve.
(49) Remove Loop Clamp (47).
NOTE
Do not tighten LACV fittings until all fittings are installed.
(50) Install two T-fittings (48) in LACV (42).
(51) Install two 90-degree block fittings (49) in T-fittings (48).
(52) Install two retained 90-degree fittings (41) in block 90-degree fittings (49).
(53) Install two retained T-fittings (40) in 90-degree fittings (41).