• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
BLADE PRO MOTOR GRADER CONTROL SYSTEM INSTALLATION. - Continued
BLADE PRO MOTOR GRADER CONTROL SYSTEM INSTALLATION. - Continued

Laser Leveling Equipment (Lle) For Graders, Dozers, & Scrapers Page Navigation
  128    129    130    131    132  133  134    135    136    137    138  
img
TM 5-6675-348-13&P
NOTE
For ease of installation, do not tighten 90-degree fittings.
(59) Install two 90-degree fittings (54) on Proportional Valve Assembly (51).
To prevent leaks and damage to equipment, ensure all plugs on back side of Proportional
Valve Assembly are tight before installation.
NOTE
Loop Clamp is installed on back side of LACV on left side only.
Rotate Loop Clamp 180 degrees before installation.
(60) Install Loop Clamp (47) and Proportional Valve Assembly (51) with two bolts (45) and flat
washers (46) on LACV (42).
(61) Tighten bolts (45).
3-97


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.