• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
SECTION III. BUCKET-PROTM SYSTEM OPERATION
OPERATION EXAMPLES.

Laser Leveling Equipment (Lle) For Graders, Dozers, & Scrapers Page Navigation
  163    164    165    166    167  168  169    170    171    172    173  
img
. . .
TM 5-6675-348-13&P
4-12.
GRAPHIC DISPLAY CONTRAST.
NOTE
During very cold weather, the display
needs a few minutes to warm up before
a viewable contrast level is obtained.
Turning the knob (1) on the back of the Graphic
Display (2), next to the electrical connector (3),
adjusts the Graphic Display contrast level
(brightness) for ambient light conditions and
viewing angle.
4-13.
BUCKET-PROTM SYSTEM
INITIALIZATION.
(1)
Press ON/OFF button (1) on front panel
of Graphic Display (2) to power up
Bucket-ProTM System.
NOTE
Before the Bucket-ProTM System
operates correctly, all Angle Sensors
should be referenced for accuracy. The
Bucket Sensor reference window
appears on the screen.
Follow instructions in window and
fully retract bucket cylinder
(TM 5-3805-280-10).
(2)
Press ENTER button to confirm selection.
4-9


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.