• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
PMCS PROCEDURES.
SECTION III. BUCKET-PROTM SYSTEM OPERATION

Laser Leveling Equipment (Lle) For Graders, Dozers, & Scrapers Page Navigation
  161    162    163    164    165  166  167    168    169    170    171  
img
TM 5-6675-348-13&P
Table 4-1. Bucket-ProTM System Operator's PMCS (Before/After) (Cont)
Location
Item
Item to
Not Fully Mission
No.
Interval
Check/Service
Procedure
Capable If:
3.
Before/After
Exit Clamp Assembly Check for any dirt, debris, or damage.
Damaged.
4.
Before/After
Pulley Assembly
Check for any dirt, debris, or damage.
Damaged.
Check for tightness. Clean dirt and debris
before operating. Repair damage before
operating.
5.
Before/After
Cable Encoder
Check for dirt, debris, or damage. Check
Damaged. Cable
Sensor
for frayed cable.
is frayed.
6.
Before/After
Voltage Protection
Ensure cable is not frayed, cracked, or
Frayed, cracked,
Cable
exposed.
or exposed wires
are evident.
7.
Before/After
EM2E-24 Electric
Check for any dirt, debris, or damage.
Damaged.
Mast Assembly
Clean dirt and debris before operating.
Repair damage before operating.
8.
Before/After
Graphic Display
Check for any dirt, debris, or damage.
Damaged.
Clean dirt and debris before operating.
Repair damage before operating.
9.
Before/After
Remote Interface Box Check for any dirt, debris, or damage.
Damaged.
Clean dirt and debris before operating.
Repair damage before operating.
10.
Before/After
Arm Pendulous
Check for any dirt, debris, or damage.
Damaged.
Angle Sensors
Clean dirt and debris before operating.
Repair damage before operating.
4-7


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.