• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
BLADE PRO MOTOR GRADER CONTROL SYSTEM INSTALLATION. - Continued
BLADE PRO MOTOR GRADER CONTROL SYSTEM INSTALLATION. - Continued

Laser Leveling Equipment (Lle) For Graders, Dozers, & Scrapers Page Navigation
  146    147    148    149    150  151  152    153    154    155    156  
img
TM 5-6675-348-13&P
(173) Start 130G Grader (138) (TM 5-3805-261-10).
(174) Park 130G Grader (138) on solid material, such as concrete, asphalt, or compacted soil.
(175) Align front tires (139) vertically and position A-frame draw bar (140) directly centered under
main frame of 130G Grader (138).
(176) Align 130G Grader (138) so that holes in articulation area (141) are aligned.
NOTE
To simplify the welding procedure, roll blade fully forward.
(177) Adjust blade (142) and measure distance from front A-frame (143) to outside corners of
Moldboard (144). Dimensions (A) and (B) should be the same.
(178) Float blade until cylinder knuckles (145) are not supporting any weight. Cylinder knuckles (145)
should rotate freely.
(179) Shut OFF 130G Grader (138) (TM 5-3805-261-10).
3-115


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.