• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
BLADE PRO MOTOR GRADER CONTROL SYSTEM INSTALLATION. - Continued
BLADE PRO MOTOR GRADER CONTROL SYSTEM INSTALLATION. - Continued

Laser Leveling Equipment (Lle) For Graders, Dozers, & Scrapers Page Navigation
  144    145    146    147    148  149  150    151    152    153    154  
img
TM 5-6675-348-13&P
NOTE
Cable tie as required.
(161) Route two Red Wires (123) through Engine Compartment (122), following path of right-side
Battery Cable (124), to right side of Battery Box (125).
(162) Install two connectors (126) and nut (127) on positive Battery Terminal (128).
(163) Tighten nut (127).
(164) Remove bell housing bolt (129).
NOTE
For proper operation, a good ground is essential.
(165) Install bell housing bolt (129) and Black Wire connectors (130).
(166) Tighten bell housing bolt (129).
3-113


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.