Home
Download PDF
Order CD-ROM
Order in Print
SECTION I - GENERAL OPERATING INSTRUCTIONS
GENERAL OPERATION
PRINCIPLES OF OPERATION
PANEL CONTROLS
PANEL CONTROLS - Continued
Figure 1-1. Keyboard Configuration
PANEL CONTROLS - Continued
SOURCE ACTUATION
TESTER EVALUATION USING MANUAL STANDARD COUNT
MANUAL EVALUATION
Figure 1-3. Field Data Worksheet
SITE PREPARATION
SURFACE ROUGHNESS ERROR
Figure 1-4. BS and AC Positions
Figure 1-6. Transmission Hole
TAKE A NUCLEAR READING ON SITE
FIELD COUNTS, TRANSMISSION AND MOISTURE
DETERMINE DRY WEIGHT
Figure 1-12. DA Form 5448-R (Percent Moisture)
MOISTURE REFLECTION ERRORS
ASPHALT CONTENT DETERMINATION
ROOF MOISTURE TESTING
RADIATION SAFETY
SECTION II - RADIATION INFORMATION
COMMON RADIATION TERMS AND VALUES
Figure 3-1. Charging
ANTICIPATED TESTS PER CHARGE
Figure 3-3. Shutter Maintenance
DIAGNOSTIC QUESTIONS
SECTION IV - SAFETY PROCEDURES
COMMANDER OF MAJOR COMMAND
LOCAL RADIATION OFFICER (LRPO)
TESTER DISPOSAL
MEDICAL RECORDS
TRANSPORTATION OF TESTERS BY USING UNITS
SURVEYS AND TESTS
Figure 4-1. Model MC-1 Nuclear Method Density and Soil Tester
Figure 4-3. Swabbing the Spot
EMERGENCY PROCEDURES
DAMAGED OR LEAKING TESTER
PERSONNEL EXPOSED TO EXCESSIVE RADIATION
TESTER MAINTENANCE
TRAINING COURSES
SUPPLEMENTAL OPERATING, MAINTENANCE AND REPAIR PARTS INSTRUCTIONS (SOMARPI)
PERSONNEL AND TRAINING
SHIPPING INSTRUCTIONS
OPERATOR/UNIT PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS)
Table 5-1. Operator's Preventive Maintenance Checks and Services
Table 5-1 Operator's Preventive Maintenance Checks and Services
Table 5-1 Operator's Preventive Maintenance Checks and Services - Continued
Table 5-1 Operator's Preventive Maintenance Checks and Services - Continued
Table 5-1 Operator's Preventive Maintenance Checks and Services - Continued
REFERENCES
MAINTENANCE ALLOCATION CHART
MAINTENANCE ALLOCATION CHART - Continued
SECTION II. - ASSIGNMENT OF MAINTENANCE FUNCTIONS
APPENDIX C - COMPONENTS OF END ITEM AND BASIC ISSUE ITEMS LISTS
SECTION III. BASIC ISSUE ITEMS
SECTION III. BASIC ISSUE ITEMS - CONTINUED
SECTION III. BASIC ISSUE ITEMS - CONTINUED
APPENDIX D - PRESCRIBED LOAD LIST (PLL) - AUTHORIZED STOCKAGE LIST (ASL)
SECTION II. EXPENDABLE/DURABLE SUPPLIES and MATERIALS LIST
SECTION II. EXPENDABLE/DURABLE SUPPLIES and MATERIALS LIST - Continued
APPENDIX F - MC-1 MAJOR SUB-ASSEMBLIES PARTS - REFERENCE DWG C-401216-A
APPENDIX G - LETTER OF INSTRUCTION
APPENDIX G - LETTER OF INSTRUCTION - Continued
APPENDIX H - SAMPLE FORMAT- MILSTRIP REQUISITION FOR CCE (NON-NSN)
APPENDIX I - SAMPLE FORMAT - MILSTRIP REQUISITION FOR CCE (NSN)
APPENDIX I - SAMPLE FORMAT - MILSTRIP REQUISITION FOR CCE (NSN) - Continued
APPENDIX J - AREA CONCEPT TESTING
Non-Biased Random Sample Cards 3, 4, 5, and 6
Non-Biased Random Sample Cards 7, 8, 9, and 10
APPENDIX K - STANDARD INTERNATIONAL (SI) - CONVERSION CHART
APPENDIX K - STANDARD INTERNATIONAL (SI) - CONVERSION CHART - Continued
APPENDIX K - STANDARD INTERNATIONAL (SI) - CONVERSION CHART - Continued
APPENDIX L
APPENDIX M
APPENDIX N