• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
MAINTENANCE ALLOCATION CHART - Continued
APPENDIX C - COMPONENTS OF END ITEM AND BASIC ISSUE ITEMS LISTS

Maintenance Manual For Tester, Density And Moisture (Soil And Asphalt) Nuclear Method Page Navigation
  51    52    53    54    55  56  57    58    59    60    61  
img
TM 5-6635-386-12&P
APPENDIX B - CONTINUED
MAINTENANCE ALLOCATION CHART FOR TESTER,
DENSITY AND MOISTURE (SOIL AND ASPHALT) NUCLEAR METHOD (CCE)
SECTION II. - ASSIGNMENT OF MAINTENANCE FUNCTIONS
(1)
(2)
(3)
(4)
(5)
Group
Maintenance
Maintenance Level*
Tools and
Number
Component/Assembly
Function
C
O
F
H
D
Equipment
Battery
Inspect
0.1
Test
0.1
Service
0.1
Replace
0.1
Shutter/Cleanout
Service
0.1
Plate
Replace
*
Fuses
Test
0.1
Replace
0.1
End Item
Inspect
0.1
Test
0.2**
Service
0.1
Adjust
0.1
Calibrate
*
Replace
*
Repair
*
Overhaul
*
* By manufacturer
** This operation performed by the LRPO for the leak test
SECTION III. - TOOL AND TEST EQUIPMENT REQUIREMENTS
Tool or Test
Equipment
Reference
Maintenance
National/NATO
Tool
Code
Category
Nomenclature
Stock Number
Number
NOTE
Wipe test kits will be supplied by the US Army Ionizing Radiation Dosimetry Center.
B-3/(B-4 blank)


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.