• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
BUCKET-PROTM SYSTEM INSTALLATION.
BUCKET-PROTM SYSTEM INSTALLATION. - Continued

Laser Leveling Equipment (Lle) For Graders, Dozers, & Scrapers Page Navigation
  193    194    195    196    197  198  199    200    201    202    203  
img
TM 5-6675-348-13&P
NOTE
To properly position Arm Sensor for
calibration, index one arm sensor mount
hole in the 9 o'clock position on the
horizontal line drawn in Step (2).
(4)
Center Arm Sensor Mounting Ring (4)
on center point of lines drawn in
Steps (2) and (3).
(5)
Trace center of Arm Sensor Mounting
Ring (4) on Arm (2).
Do not weld on the Arm Sensor
Mounting Ring directly under arm
sensor mounting holes. Welding under
the arm sensor mounting holes may
damage the threads.
(6)
Mark location of Arm Sensor mounting
holes and welding locations on Arm (2).
4-39


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.