TM 5-6665-202-13
Section II. MOVEMENT TO A NEW WORKSITE
Dismantling for Movement
CAUTION
Preparation for Movement.
a.
counterclockwise before latching the top case
to the bottom case. After securing the case,
(1)
close the relief valve by turning it clockwise
until snug. This procedure minimizes differ-
battery in the compartment provided in the bottom case.
ences between interior and exterior air pres-
sures.
(2)
nect the extension handle. To collapse and disconnect
extension handle on Model P158, rotate male speed
Movement. The mine detector set case is pro-
b.
coupling until bayonet socket is free at internal pins in
vided with a handle for carrying, and is easily transported.
female speed coupling, and disconnect.
If the movement requires greater than walking distance, the
detector set may be loaded on any vehicle as the compo-
(3)
nents are cushioned against shock, and the case is designed
detector head, and headset in their proper positions in the
of sturdy material for this purpose.
carrying case.
(4) Place the top case on the bottom case and se-
CAUTION
cure with the six latches provided on the bottom case.
Exercise care when moving the mine detector
CAUTION
set either in or out of the case. Be extremely
careful not to bump or jar the equipment. If the
Be careful when closing the carrying case. The
detector set is to be moved over rough terrain
top case will fit onto the bottom case in only one
it must be secured in the case unless it is being
way. Damage to the case latches will result from
operated.
incorrect closure.