INSTALLATION AND OPERATION INSTRUCTIONS
Se c t ion I . SERV I CE U PON RECEI PT OF EQU I PM EN T
d. Correct all deficiencies or report to organi-
6 . U npa c k ing t he Equipm e nt
zational maintenance.
a. Remove the tape securing the packing
carton.
8 . I nst a lla t ion of Se pa ra t e ly Pa c k e d
b. Remove the packing carton from the
Com pone nt s
carrying case.
There are no separately packed components
c. Unlock the carrying case and remove the
with the surveying target set.
surveying target set.
9 . I nst a lla t ion or Se t t ing-up I nst ruc t ions
7 . I nspe c t ing a nd Se rvic ing Equipm e nt
a. Mount the tribrach onto the tripod issued
a. Inspect the entire unit for loose or missing
with the theodolite.
mounting hardware.
b. Check the equipment against the packing
b. Mount the target onto the tribrach.
list and make sure all items are with the unit.
c. Center the target precisely over the
c. Inspect the entire unit to make sure no
station.
damage was incurred during shipment.
Se c t ion I I . CON T ROLS AN D I N ST RU M EN T S
1 1 . Cont rols a nd I nst rum e nt s
This section describes, locates, illustrates,
Refer to figure 3 for the purpose and location
and furnishes the operator sufficient informat-
of all controls and instruments.
ion about the various controls for proper
operation of the surveying target set.
AGO 10139A