• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 71. Left side axis bearing, vertical circle, vertical circle housing, and vertical circle prism carrier, disassembly and reassembly.
Section XVII. ILLUMINATION SYSTEM

Theodolite; Directional 2/10 Sec, Degree Graduation 10.2-In. Long Telescope W/ Accessories Page Navigation
  80    81    82    83    84  85  86    87    88    89    90  
img
. . . . . . .
telescope, and contains the vertical circle, micrometer
(5) Remove
the
micrometer
circle
circle, collimation level, slow-motion screws, plate level,
illumination prism (par. 99).
and prism.
It permits revolving and aiming the
(6) Remove the vertical circle illumination
telescope in any azimuthal or vertical direction.
prism (par. 98).
126. U-Standard and Inner Vertical Axis
(7) Refer to figure 72 and remove and
a. Removal and Disassembly.
disassemble the U-standard and inner
vertical axis.
b. Cleaning, Inspection, and Repair.
(1) Remove the telescope axis bearings
(pars. 122 and 124).
(1) Clean all metal parts with an approved
(2) Remove the horizontal, vertical, and
cleaning solvent and dry thoroughly.
collimation slow-motion screws (par. 108).
Clean the window and lens with lens
(3) Remove the horizontal circle housing
tissue or lens cloth.
(par. 120).
(2) Inspect  the  U-standard  for  cracks,
damaged bearing surfaces, and worn or
(4) Remove the plate level (par. 97).
damaged threads.
Inspect the win
Figure 72. U-standard and inner vertical axis, removal, disassembly,
reassembly, and installation.
AGO 5078A
87


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.