2-8.
PREPARATION FOR USE
Before you start the Bath
TM 10-4510-206-14
Unit, go to Section 11. Operators Preventive
Maintenance Checks and Services (PMCS) and do the Before Operation
checks in
the table and then proceed as follows:
a.
Make certain water heater load limit switch (1) is turned to OFF.
b.
Make sure that manual fuel valve (2) is closed.
2-17