TM 10-4510-206-145-7.REPAIR PROCEDURES (CONT’D)p.Master Control Box Assembly.Test the components in the master controlbox and repair the unit by replacing the defective component. Theflame safeguard control and buzzer repair was described in paragraph5-7.High voltages that are dangerous to human life may bepresent. Before working on electrical circuits,remove all power from the water heater.1. Turn off power switch (1) and disconnect power cable (2).5-87
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business