• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Table B-2. Blade Pro Motor Grader Control System Maintenance Allocation Chart (Cont)
Table B-4. Transmitter Control System Maintenance Allocation Chart

Laser Leveling Equipment (Lle) For Graders, Dozers, & Scrapers Page Navigation
  269    270    271    272    273  274  275    276    277    278    279  
img
. .
TM 5-6675-348-13&P
Table B-3. Bucket-ProTM Control System Maintenance Allocation Chart
(1)
(2)
(3)
(4)
(5)
(6)
Group
Maintenance
Maintenance Level
Tools &
Equipment
No.
Component/Assembly
Function
Remarks
C
O
F
H
D
Bucket-ProTM
Control System
06
ELECTRICAL
SYSTEM
0.5
0606
Voltage Protection
Inspect
1
0.5
Cable
Test
1
0.5
Replace
35
PULLEYS, BELTS,
SHAFTS
3501
Flat belt Assembly
Inspect
0.5
Replace
1.0
1
67
PRECISION
INSTRUMENTS AND
SYSTEMS,
MECHANICAL,
ELECTRICAL,
ELECTRONIC
0.5
6709
EM2E-24 Laser
Inspect
Repair
0.5
1
B
Receiver, R2S-S
Replace
0.5
6709
EM2E-24 Electric Mast
Inspect
0.5
1
Assembly
Replace
Repair
B
6711
Graphic Display
Inspect
0.5
Repair
B
Replace
0.5
1
6711
Remote Interface Box
Inspect
0.5
Repair
B
Replace
0.5
1
6711
Arm Sensors
Inspect
0.5
Calibrate
0.5
1
A
Replace
6711
Boom Pendulous Angle
Inspect
0.5
Sensors
Replace
0.5
1
A
6711
Cable Encoder Sensors
Inspect
0.5
Replace
0.5
1
6713
Electrical Cables and
Inspect
0.5
Coil Cords
Test
0.5
1
Replace
0.5
1
B-7


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.