• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
BUCKET-PROTM SYSTEM INSTALLATION. - Continued
BUCKET-PROTM SYSTEM INSTALLATION. - Continued

Laser Leveling Equipment (Lle) For Graders, Dozers, & Scrapers Page Navigation
  206    207    208    209    210  211  212    213    214    215    216  
img
TM 5-6675-348-13&P
(52) Remove two screws (67) from lower
Side Window Guard (68). Discard
screws (67).
(53) Install Graphic Display Mounting
Block (69) to lower Side Window
Guard (68) with two screws (70).
(54) Install Graphic Display Mounting
Plate (71) on Graphic Display
Mounting Block (69) with three
screws (72).
4-52


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.