• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 10. Leapfrog method.
SECTION VII. MAINTENANCE

Altimeter, Surveying 4,500 Meters 2 Meter Divisions Page Navigation
  29    30    31    32    33  34  35    36    37    38    39  
img
.
f.
The survey may be speeded up by employing additional altimeters, and by comparing readings at every third
or fourth field station instead of at alternate stations.
g.  At the completion of the survey, computations are made using the same procedures outlined for the single-
base method of altimetry, described in paragraph 18.
36


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.