TM 10-4510-206-14
5-7.
REPAIR PROCEDURES (CONTD)
b.
Shipping Containers (Contd)
3.
To remove latch and strike assembly (5), remove two screws (6)
each.
4.
Replace latch and strike assembly (5) using two screws each.
5.
To remove handle (7), remove five nuts (10), five washers (9) and
five screws (8).
6.
Replace handle (7) using five screws (8), five washers (9), and
five nuts (10)0
5-15