TM 104510-206-14
4-14.
WATER HEATER MAINTENANCE PROCEDURES (CONTD)
h.
Blower Assembly (Contd)
15.
On back side of blower assembly,
insert conduit connector (18) into
junction box (19) and secure with nut (17).
16.
Connect tagged wires (16).
Install cover plate (15) using two
screws (14).
4-102