TM 5-6635-386-12&P
corners of the tester's display panel, pull off panel, and
cut or disconnect wiring).
5-5. REPAIR PARTS AND SUPPORT. Requisitions will
b. Destroy the display panel and circuit boards
be forwarded to and filled by DCSC. Routing identifier
by crushing.
code (S9C) under milstrip procedures (AR 725-50) for
c. Destroy worksheet and logs by crushing,
Appendix 1. Requisitions should cite manufacturer's part
tearing, and burying, or scattering over a sufficiently
numbers in the absence of NSN's.
large area to make recovery improbable.
5-6. PERSONNEL AND TRAINING
d. Abandon the remainder of the tester.
a. All operational and support personnel will
5-11. PROCEDURE. In addition to operating and
require training on the safe handling of nuclear devices
maintenance instructions, see Section IV, Safety
Procedures, in this manual.
b. MOS Training: TRADOC will manage and
5-12. MANUFACTURER'S SAFETY DEFECTS. If any
coordinate the MOS training of operators. This training
will be conducted by the 51 Committee (51 G) at Ft.
manufacturer's safety defects occur, upon notification
Leonardwood, MO.
TACOM will advise users on action to be taken for
correction and reporting.
5-7.
EQUIPMENT PUBLICATIONS
5-13. MANUFACTURER'S FIELD CAMPAIGNS AND
a. Initially two sets of the Commercial Instruction
MODIFICATIONS. Modifications are not anticipated. If
Manuals, supplemented by a separate SOMARPI and TB
necessary, they will be applied by CPN after TACOM's
385-1 03 (Safety Procedures) were issued to support the
approval of the field campaign or modification plan.
soil tester.
5-14. BASIC ISSUE ITEM LIST. List of items which
b. After initial issue of Tester, the manufacturers
accompany the tester or are required for installation,
manuals, the SOMARPI and TB 385-103 were combined
into this manual.
5-15. PERSONNEL DOSIMETRY. See Section IV in
5-8.
FACILITIES
this manual.
a. No special maintenance facilities are required
5-16. SHIPPING
INSTRUCTIONS.
Shipping
for the tester.
Information for Tester, Density and Moisture, Nuclear
Method, NSN 6635-01-030-6896. For additional
b. For storage facilities, see Section IV, Para 4-
17 and 4-18.
a. Consult with the unit Transportation Officer to
5-9.
EQUIPMENT IMPROVEMENT
insure that the tester is shipped in accordance with
RECOMMENDATION (EIR'S). EIR's will be submitted in
Department of Transportation Regulations (Title 49 CFR
accordance with instructions contained in DA PAM 738-
Parts 170-189) AR 385-11, TM 38-250, and the Nuclear
750.
Regulatory Commission Regulations (Title 10 CFR Part
71). For CONUS, a commercial shipper should be used
5-10. DESTRUCTION TO PREVENT ENEMY USE.
to transport the tester.
When the tester cannot be evacuated the following will
be done:
b. The following information is provided to assist
a. Remove the circuit boards and display panel
in the preparation of shipping papers for the tester (Title
(loosen and remove the four screws located in the
49 CFR Parts 172-173):
5-2