TM 10-4510-206-14
2-11.
SHUTDOWN PROCEDURES (CONTD)
If the Bath Unit will not be used for five days or more, perform the following
procedures.
g.
Remove fuel feed hose (8) from fuel container (9).
h.
Place end of hose (8) into quart container (10).
i .
Fill container (10) with diesel fuel.
j .
Turn on load limit switch (2) and allow unit to operate until quart
container (10) is almost empty.
Turn off water heater fuel shut
valve and let system operate until flame extinguishes.
k.
Turn off load limit switch (2).
off
2-29