TM 10-4510-206-14
4-14.
WATER HEATER MAINTENANCE PROCEDURES (CONTD)
a.
Fuel Supply Control Assembly (Contd)
16.
Insert fuel solenoid valve wires in conduit and install fuel supply
control assembly (2) to water heater skid using two screws (6) and
two washers (7). Tighten screws.
17.
Connect conduit coupling (5) to solenoid valve (18).
18.
Connect elbow (10) to fuel pump (11).
19.
Connect fuel line (4) to elbow (10) and other end to elbow (12)
on fuel supply control assembly (2).
20.
Connect adapter (8) to burner head (9).
21.
Connect fuel line (3) to adapter (8) and to elbow (19) on fuel
supply control assembly.
Tighten all couplings.
4-61