TM 10-4510-206-14
4-10.
MISCELLANEOUS ITEMS MAINTENANCE PROCEDURES (CONTD)
d.
Smoke Stack and Guard Assembly. Repair the smoke stack and guard
assembly by removing and replacing the components.
Proceed as follows:
1.
Firmly grasp smoke stack and guard assembly (1) and lift
upward to clear smoke stack (2).
2.
Loosen nut and screw (3 and 4) on flue support (5) and remove smoke
stack (2).
3.
Separate two sections of stove pipe (2).
4.
Twist elbow (6) to left and pull out to remove.
4-22